As a professional manufacturer, we supply efficient coal pulverizing systems with compact structure, explosion-proof design and full after-sales support, ideal for large-scale coal processing production lines.
Item No :
Pulverized Coal Vertical MillOrder(MOQ) :
1Payment :
NegotiationProduct Origin :
ChinaColor :
CustomizeShipping Port :
China PortsLead Time :
NegotiationWeight :
Based on actualCoal Pulverizing System - Professional Coal Preparation Solution
Product Overview
Focus on Precision & Core Role
The Heart of Your Fuel Preparation Process
As the core equipment in any coal-consuming operation, our pulverizing system transforms raw coal into precisely graded pulverized fuel—essential for boiler combustion, kiln firing, and coal injection. Built on advanced engineering principles, it integrates proven mechanical technology with intelligent controls to deliver consistent performance, operational stability, and low production costs. Whether processing bituminous coal, lignite, anthracite, or petroleum coke, our system adapts seamlessly to your required capacity and fineness specifications.
Core Features
30–50% Higher Efficiency: Advanced grinding technology outperforms traditional ball mills, drastically cutting energy use.
Optimized Energy Savings: Streamlined structure and energy-efficient motors reduce power consumption and operating costs.
Uninterrupted Operation: Robust design and premium components ensure high reliability and minimal downtime.
Precision Control: Fineness adjusts easily to match diverse application requirements.
Low Emissions: Integrated high-efficiency dust collection meets global environmental standards.
Space-Saving Design: Compact footprint simplifies installation in any facility.
Intelligent Control: Automatic control system enables easy operation, reducing manual intervention and labor costs.
HVM pulverized coal vertical mill specifications, technical parameters
|
Model Specification |
HVM1100M |
HVM1250M |
HVM1300M |
HVM1400M |
HVM1500M |
|
Capacity |
5~8 t/h |
8~10 t/h |
10~12 t/h |
12~15 t/h |
15~20 t/h |
|
Main Motor Power |
90 kW |
110/132 kW |
185/200 kW |
200/220 kW |
220/250 kW |
|
Raw coal moisture |
<15% |
||||
|
Pulverized coal fineness |
R0.08=2%~12% |
||||
|
Pulverized coal moisture |
≤1% (Under the premise of meeting the drying requirements) |
||||
|
Model Specification |
HVM1700M |
HVM1900M |
HVM2200M |
HVM2400M |
HVM2800 |
|
Capacity |
20~25 t/h |
25~35 t/h |
35~45 t/h |
45~55 t/h |
70~90 |
|
Main Motor Power |
315/355 kW |
400/450 kW |
450/500 kW |
560/630 kW |
900/1120 |
|
Description |
Note: 1. The original coal Hastelloy grindability coefficient ≥ 55; |
||||
HVM pulverized coal vertical mill specifications, technical parameters (Metallurgy, heat, energy industry)
|
Model specification |
HVM800M |
HVM1100M |
HVM1250M |
HVM1300M |
HVM1400M |
HVM1500M |
|||
|
Capacity |
3~5 t/h |
7~10 t/h |
9~12 t/h |
13~17 t/h |
14~19 t/h |
18~24 t/h |
|||
|
Main Motor Power |
45/55 kW |
90/110 kW |
110/132kW |
185/200 kW |
200/220 kW |
220/250kW |
|||
|
Raw coal moisture |
<15% |
||||||||
|
Pulverized coal fineness |
R0.08=10%~15% (fineness of coal powder for blast furnace coal injection: 200 mesh 80% pass) |
||||||||
|
Pulverized coal moisture |
1%~6% (Under the premise of meeting the drying requirements) |
||||||||
|
Model specification |
HVM1700M |
HVM1900M |
HVM2200M |
HVM2400M |
HVM2800M |
||||
|
Capacity |
23~30 t/h |
29~36 t/h |
36~45 t/h |
45~55 t/h |
70~90 |
||||
|
Main Motor Powerr |
280/315kW |
355/400 kW |
450/500 kW |
560/630 kW |
900/1120 |
||||
|
Description |
Note: The original coal Hastelloy grindability coefficient HGI:55~70 |
||||||||
Vertical Grinding System Process
Raw materials are elevated into a silo, then fed into a vertical roller mill for grinding and drying. Qualified fine powder is separated via a classifier and cyclone, while coarse powder returns for regrinding. Exhaust gas is purified by a bag filter before emission. Finished powder is stored in a silo, ready for packaging or dispatch.

Project Cases
![]() |
![]() |
|
★ Project Name: Supporting 168m³ Blast Furnace Coal Injection Project (Manganese Smelting Project) ★ Project scope: HVM800M vertical coal powder preparation system ★ Processing material type: bituminous coal and anthracite mixed coal ★ Output: ≥ 3.5t/h ★ Product fineness: 200 mesh, 90% pass ★ Production time: 2022 |
|
FAQ – Coal Pulverizing System
1. What materials can your coal pulverizing system process?
Our system is specially designed for coal grinding, suitable for various coal types and coal-based materials, including bituminous coal, anthracite, lignite, coal gangue, coal slime, and other materials with similar grindability.
2. What capacity and fineness can your system achieve?
For coal powder processing, the system capacity ranges from 3 to 200 tons per hour. The finished coal powder fineness can be adjusted between 200 mesh and 1250 mesh to meet different application requirements such as power plants, cement plants, and industrial boilers.
3. How do I choose the right system model?
Our engineers will recommend the most suitable model based on your raw coal type (bituminous coal, anthracite, lignite), required capacity, target fineness, raw coal moisture content, application scenario, and site conditions.
4. What is the difference between a vertical mill and a ball mill for coal grinding?
Compared with a ball mill, our vertical mill offers higher grinding efficiency (30%–50% increase), lower energy consumption, larger capacity, smaller footprint, better environmental performance (less dust and noise), and easier maintenance—making it the ideal choice for large-scale coal powder production.
5. Can you provide customized coal pulverizing solutions?
Yes, we provide customized design and manufacturing based on your specific requirements, including capacity, fineness, coal type, site layout, and special conditions such as high-moisture coal slime.
6. Do you offer a complete coal powder production line?
Yes, we provide turnkey solutions covering the entire coal grinding process, including crusher, bucket elevator, feeder, vertical mill, dust collector, control system, and packaging machine.
7. What installation and after-sales services do you provide?
We offer on-site guidance for installation and commissioning, operator training, long-term supply of wear-resistant spare parts, and 24/7 online technical support to ensure stable operation.
8. What is the delivery time?
Delivery time is approximately 90–120 working days for standard models, and around 120 working days for customized production lines.
9. What control system does your pulverizing system use?
The system is equipped with an advanced PLC automatic control system with a touch screen interface, enabling intelligent and unmanned operation of feeding, grinding, classifying, and drying, with remote monitoring and fault alarm functions.
10. Do your products have certifications?
Yes, our coal pulverizing systems meet international industrial standards and hold certifications such as CE and ISO, ensuring quality, safety, and environmental compliance for global export.
11. Looking for a reliable coal pulverizing system?
If you are seeking a high-quality, energy-efficient, and cost-effective solution for coal powder production in power plants, cement plants, or boiler combustion applications, contact us today. We provide:
- Free quotation
- Customized solutions
- Detailed technical parameters and catalogs
- On-site installation, commissioning, and after-sales support
Contact us now to get the best price and professional support for your coal grinding project!
leave a message
Wechat :
Whatsapp :
Home
Products
contact